3 Found
Procedure | Type | Average Turnaround | Sample Certificate |
---|---|---|---|
TW5000 Process Spec | Inspection | 4 Days |
![]() |
TW5000 Process Spec | Overhaul | 6 Days |
![]() |
TW5000 Process Spec | Repair | 3 Days |
![]() |
21 Found
Description | Failure Rate |
---|---|
BEARING | 5.0% |
BRUSH KIT | 25.0% |
DE BEARING | 50.0% |
DE FRAME | 5.0% |
DE HOUSING | 10.0% |
DE SHIELD ASSY (DE FRAME) | 5.0% |
LOC TAB | 5.0% |
NEG BRUSH | 15.0% |
NEG RECTIFIER | 5.0% |
NEG. BRUSH | 5.0% |
NEGATIVE BRUSH | 10.0% |
POS BRUSH | 25.0% |
POS RECTIFIER | 5.0% |
POSITIVE BRUSH | 10.0% |
RECTIFIER REPAIR | 5.0% |
ROTOR | 5.0% |
SRE BEARING | 60.0% |
SRE FRAME | 5.0% |
STATOR | 35.0% |
STATOR ASSY | 5.0% |
THRU BOLT | 5.0% |
Aircraft Electrical Components, Inc.
dba. Nevada Repair Center
11A Marconi
Irvine, CA 92618
Email: sales@aecnrc.com
Phone: 530-221-4397