6 Found
Procedure | Type | Average Turnaround | Sample Certificate |
---|---|---|---|
OE-A2 | Inspection | 2 Days |
![]() |
OE-A2 | Overhaul | 5 Days |
![]() |
OE-A2 | Repair | 3 Days |
![]() |
TW5000 | Inspection | 4 Days |
![]() |
TW5000 | Overhaul | 6 Days |
![]() |
TW5000 | Repair | 3 Days |
![]() |
0 Found
16 Found
Description | Failure Rate |
---|---|
BEARING | 25.0% |
BRUSH KIT | 25.0% |
CAPACITOR | 0.0% |
DE BEARING | 25.0% |
DRIVE BUSHING | 0.0% |
FAN | 25.0% |
INSULATOR | 50.0% |
O-RING | 25.0% |
ROTOR | 0.0% |
SEAL | 25.0% |
SEAL SPACER | 25.0% |
SRE BEARING | 0.0% |
SRE HOUSING | 0.0% |
STATOR | 0.0% |
STATOR INSULATOR | 25.0% |
WOODRUFF KEY | 0.0% |
Aircraft Electrical Components, Inc.
dba. Nevada Repair Center
11A Marconi
Irvine, CA 92618
Email: sales@aecnrc.com
Phone: 530-221-4397