6 Found
Procedure | Type | Average Turnaround | Sample Certificate |
---|---|---|---|
OE-A2 | Inspection | 2 Days |
![]() |
OE-A2 | Overhaul | 5 Days |
![]() |
OE-A2 | Repair | 3 Days |
![]() |
TW5000 | Inspection | 4 Days |
![]() |
TW5000 | Overhaul | 6 Days |
![]() |
TW5000 | Repair | 3 Days |
![]() |
0 Found
10 Found
Description | Failure Rate |
---|---|
BEARING | 62.5% |
BRUSH SET | 75.0% |
CAUTION PLACARD (RED) | 12.5% |
DE BEARING | 87.5% |
EYELET | 37.5% |
NEGATIVE RECTIFIER | 37.5% |
NUT & WASHER PACKAGE | 12.5% |
RECTIFIER ASSY | 37.5% |
SRE BEARING | 25.0% |
TERMINAL PACKAGE | 25.0% |
Aircraft Electrical Components, Inc.
dba. Nevada Repair Center
11A Marconi
Irvine, CA 92618
Email: sales@aecnrc.com
Phone: 530-221-4397