6 Found
Procedure | Type | Average Turnaround | Sample Certificate |
---|---|---|---|
OE-A2 | Inspection | 2 Days |
![]() |
OE-A2 | Overhaul | 5 Days |
![]() |
OE-A2 | Repair | 3 Days |
![]() |
TW5000 Process Spec | Inspection | 4 Days |
![]() |
TW5000 Process Spec | Overhaul | 6 Days |
![]() |
TW5000 Process Spec | Repair | 3 Days |
![]() |
9 Found
Description | Failure Rate |
---|---|
BRUSH SET | 52.6% |
BRUSHES | 15.8% |
DE BEARING | 68.4% |
RECTIFIER ASSY | 15.8% |
REPAIR KIT | 5.3% |
SRE BEARING | 68.4% |
SRE HOUSING MOUNT BUSHING | 5.3% |
STATOR | 5.3% |
TERMINAL PACKAGE | 5.3% |
Aircraft Electrical Components, Inc.
dba. Nevada Repair Center
11A Marconi
Irvine, CA 92618
Email: sales@aecnrc.com
Phone: 530-221-4397