6 Found
Procedure | Type | Average Turnaround | Sample Certificate |
---|---|---|---|
OE-A2 | Inspection | 2 Days |
![]() |
OE-A2 | Overhaul | 5 Days |
![]() |
OE-A2 | Repair | 3 Days |
![]() |
TW5000 Process Spec | Inspection | 4 Days |
![]() |
TW5000 Process Spec | Overhaul | 6 Days |
![]() |
TW5000 Process Spec | Repair | 3 Days |
![]() |
0 Found
11 Found
Description | Failure Rate |
---|---|
BEARING & SEAL PKG | 41.7% |
BRUSH & SPRING | 0.0% |
BRUSH SET | 50.0% |
CARBON BRUSH | 0.0% |
DE BEARING | 50.0% |
DE HEAD ASSY | 16.7% |
ROTOR | 8.3% |
ROTOR KIT | 8.3% |
SRE FRAME | 8.3% |
STATOR | 16.7% |
VENT FAN | 0.0% |
Aircraft Electrical Components, Inc.
dba. Nevada Repair Center
11A Marconi
Irvine, CA 92618
Email: sales@aecnrc.com
Phone: 530-221-4397