3 Found
Procedure | Type | Average Turnaround | Sample Certificate |
---|---|---|---|
TW5000 Process Spec | Inspection | 4 Days |
![]() |
TW5000 Process Spec | Overhaul | 6 Days |
![]() |
TW5000 Process Spec | Repair | 3 Days |
![]() |
0 Found
16 Found
Description | Failure Rate |
---|---|
ALE-2008AA | 8.6% |
BEARING | 17.1% |
BEARING & SEAL KIT | 20.0% |
BEARING & SEAL PKG | 31.4% |
BRUSH HOLDER | 0.0% |
BRUSH SET | 45.7% |
CARBON BRUSH | 5.7% |
DE BEARING | 34.3% |
DE FRAME ASSY | 0.0% |
DRIVE COUPLING | 2.9% |
O-RING | 51.4% |
OIL SEAL | 51.4% |
ROTOR | 2.9% |
SPACER | 2.9% |
SRE HEAD ASSY | 0.0% |
TERMINAL PACKAGE | 0.0% |
Aircraft Electrical Components, Inc.
dba. Nevada Repair Center
11A Marconi
Irvine, CA 92618
Email: sales@aecnrc.com
Phone: 530-221-4397