3 Found
Procedure | Type | Average Turnaround | Sample Certificate |
---|---|---|---|
1M-125 | Inspection | 5 Days | Sample Certificate |
1M-125 | Overhaul | 8 Days | Sample Certificate |
1M-125 | Repair | 3 Days | Sample Certificate |
0 Found
9 Found
Description | Failure Rate |
---|---|
ARMATURE | 33.3% |
BRUSH | 33.3% |
BUSHING | 33.3% |
DE BUSHING | 66.7% |
DE OIL SEAL | 33.3% |
FIBER WASHER | 33.3% |
FIELD TERMINAL STUD | 33.3% |
O-RING | 66.7% |
OIL SEAL | 33.3% |
Aircraft Electrical Components, Inc.
dba. Nevada Repair Center
6985 Arlington Ave
Suite G
Riverside, CA 92503
Email: sales@aecnrc.com
Phone: 530-221-4397