6 Found
Procedure | Type | Average Turnaround | Sample Certificate |
---|---|---|---|
OE-A2 | Inspection | 2 Days |
![]() |
OE-A2 | Overhaul | 5 Days |
![]() |
OE-A2 | Repair | 3 Days |
![]() |
TW5000 | Inspection | 4 Days |
![]() |
TW5000 | Overhaul | 7 Days |
![]() |
TW5000 | Repair | 4 Days |
![]() |
0 Found
14 Found
Description | Failure Rate |
---|---|
#10 NUT GROUND | 5.9% |
BEARING | 70.6% |
BRUSH HOLDER ASSY. | 88.2% |
DE BEARING | 94.1% |
DE HOUSING | 11.8% |
INSULATOR | 35.3% |
LOCKWASHER | 5.9% |
MAGNETO | 5.9% |
NUT | 5.9% |
NUT & WASHER ASSY | 5.9% |
NUT/WASHER ASSY - BATT | 5.9% |
REPAIR KIT | 5.9% |
SRE BEARING | 23.5% |
STATOR | 29.4% |
Aircraft Electrical Components, Inc.
dba. Nevada Repair Center
6985 Arlington Ave
Suite G
Riverside, CA 92503
Email: sales@aecnrc.com
Phone: 530-221-4397