3 Found
| Procedure | Type | Average Turnaround | Sample Certificate |
|---|---|---|---|
| 1M-125 | Inspection | 5 Days |
|
| 1M-125 | Overhaul | 8 Days |
|
| 1M-125 | Repair | 3 Days |
|
0 Found
13 Found
| Description | Failure Rate |
|---|---|
| ARMATURE | 11.1% |
| BRUSH | 22.2% |
| BRUSH CONNECTOR | 5.6% |
| BRUSH LEAD | 5.6% |
| BUSHING | 5.6% |
| C.E. FRAME ASSY | 11.1% |
| CE OILER | 5.6% |
| DE BUSHING | 5.6% |
| FIBER WASHER | 27.8% |
| O-RING | 50.0% |
| OIL SEAL | 50.0% |
| SHIM PACK | 5.6% |
| THRUST WASHER | 5.6% |
Aircraft Electrical Components, Inc.
dba. Nevada Repair Center
6985 Arlington Ave
Suite G
Riverside, CA 92503
Email: sales@aecnrc.com
Phone: 530-221-4397