6 Found
Procedure | Type | Average Turnaround | Sample Certificate |
---|---|---|---|
OE-A2 | Inspection | 2 Days |
![]() |
OE-A2 | Overhaul | 5 Days |
![]() |
OE-A2 | Repair | 3 Days |
![]() |
TW5000 | Inspection | 4 Days |
![]() |
TW5000 | Overhaul | 7 Days |
![]() |
TW5000 | Repair | 4 Days |
![]() |
0 Found
8 Found
Description | Failure Rate |
---|---|
BRUSH SET | 100.0% |
BUSHING | 100.0% |
FIELD COIL | 33.3% |
FIELD COIL PACKAGE | 0.0% |
O-RING | 100.0% |
OIL SEAL | 100.0% |
TERMINAL STUD PACKAGE | 0.0% |
THRUST WASHER PKG | 33.3% |
Aircraft Electrical Components, Inc.
dba. Nevada Repair Center
6985 Arlington Ave
Suite G
Riverside, CA 92503
Email: sales@aecnrc.com
Phone: 530-221-4397