3 Found
| Procedure | Type | Average Turnaround | Sample Certificate |
|---|---|---|---|
| TW5000 | Inspection | 4 Days |
|
| TW5000 | Overhaul | 7 Days |
|
| TW5000 | Repair | 4 Days |
|
0 Found
12 Found
| Description | Failure Rate |
|---|---|
| BEARING | 14.3% |
| BEARING & SEAL PKG | 42.9% |
| BRUSH & SPRING | 14.3% |
| BRUSH SET | 14.3% |
| CARBON BRUSH | 42.9% |
| DE BEARING | 28.6% |
| DE HEAD ASSY | 28.6% |
| DRIVE COUPLING | 14.3% |
| O-RING | 28.6% |
| OIL SEAL | 57.1% |
| OVERHAUL KIT | 42.9% |
| STATOR | 14.3% |
Aircraft Electrical Components, Inc.
dba. Nevada Repair Center
6985 Arlington Ave
Suite G
Riverside, CA 92503
Email: sales@aecnrc.com
Phone: 530-221-4397