6 Found
| Procedure | Type | Average Turnaround | Sample Certificate |
|---|---|---|---|
| OE-A2 | Inspection | 2 Days |
|
| OE-A2 | Overhaul | 5 Days |
|
| OE-A2 | Repair | 3 Days |
|
| TW5000 | Inspection | 4 Days |
|
| TW5000 | Overhaul | 7 Days |
|
| TW5000 | Repair | 4 Days |
|
0 Found
11 Found
| Description | Failure Rate |
|---|---|
| BEARING & SEAL PKG | 75.0% |
| BRUSH & SPRING | 8.3% |
| BRUSH SET | 66.7% |
| CARBON BRUSH | 16.7% |
| DE BEARING | 83.3% |
| DE HEAD ASSY | 25.0% |
| ROTOR | 8.3% |
| ROTOR KIT | 8.3% |
| SRE FRAME | 8.3% |
| STATOR | 16.7% |
| VENT FAN | 16.7% |
Aircraft Electrical Components, Inc.
dba. Nevada Repair Center
6985 Arlington Ave
Suite G
Riverside, CA 92503
Email: sales@aecnrc.com
Phone: 530-221-4397