6 Found
Procedure | Type | Average Turnaround | Sample Certificate |
---|---|---|---|
OE-A2 | Inspection | 2 Days |
![]() |
OE-A2 | Overhaul | 5 Days |
![]() |
OE-A2 | Repair | 3 Days |
![]() |
TW5000 | Inspection | 4 Days |
![]() |
TW5000 | Overhaul | 7 Days |
![]() |
TW5000 | Repair | 4 Days |
![]() |
0 Found
9 Found
Description | Failure Rate |
---|---|
BEARING | 66.7% |
BRUSH SET | 100.0% |
DE BEARING | 100.0% |
DE HEAD ASSY | 33.3% |
EYELET | 33.3% |
NEGATIVE RECTIFIER | 33.3% |
POSITIVE RECTIFIER | 33.3% |
SRE BEARING | 33.3% |
THRU-BOLT PACKAGE | 33.3% |
Aircraft Electrical Components, Inc.
dba. Nevada Repair Center
6985 Arlington Ave
Suite G
Riverside, CA 92503
Email: sales@aecnrc.com
Phone: 530-221-4397