3 Found
| Procedure | Type | Average Turnaround | Sample Certificate |
|---|---|---|---|
| 1G-150 | Inspection | 5 Days |
|
| 1G-150 | Overhaul | 7 Days |
|
| 1G-150 | Repair | 3 Days |
|
0 Found
11 Found
| Description | Failure Rate |
|---|---|
| ARMATURE | 6.7% |
| BEARING | 6.7% |
| BEARING (MRC) | 53.3% |
| BRUSH | 46.7% |
| CE BEARING | 13.3% |
| DE BEARING | 13.3% |
| DE FRAME | 13.3% |
| FRAME | 6.7% |
| INSULATOR | 6.7% |
| LABOR- FIELD TERM. REPAIR | 6.7% |
| TERMINAL STUD | 13.3% |
Aircraft Electrical Components, Inc.
dba. Nevada Repair Center
6985 Arlington Ave
Suite G
Riverside, CA 92503
Email: sales@aecnrc.com
Phone: 530-221-4397