3 Found
| Procedure | Type | Average Turnaround | Sample Certificate |
|---|---|---|---|
| D5108-1-13 | Inspection | 5 Days |
|
| D5108-1-13 | Overhaul | 5 Days |
|
| D5108-1-13 | Repair | 6 Days |
|
0 Found
15 Found
| Description | Failure Rate |
|---|---|
| BEARING | 58.8% |
| BOLT | 2.9% |
| BRUSH HOLDER ASSY. | 47.1% |
| BRUSH KIT | 5.9% |
| CAPACITOR | 2.9% |
| DE BEARING | 58.8% |
| DE HOUSING | 17.6% |
| INSULATOR | 17.6% |
| MAGNETO | 5.9% |
| OVERHAUL KIT | 20.6% |
| REAR HOUSING | 2.9% |
| RECTIFIER | 8.8% |
| ROTOR ASSY | 20.6% |
| SRE BEARING | 8.8% |
| STATOR | 20.6% |
Aircraft Electrical Components, Inc.
dba. Nevada Repair Center
6985 Arlington Ave
Suite G
Riverside, CA 92503
Email: sales@aecnrc.com
Phone: 530-221-4397